OPTIMASI JUMLAH TENAGA KERJA OLEH KONTRAKTOR DENGAN METODE SIMPLEKS PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG SARANA PENUNJANG RSUD PRAMBANAN

  • Elsa Rosiana Universitas Sains Al-Qur'an
  • Wiji Lestarini

Abstract

In construction projects, delays are often caused by labor issues, such as a shortage of workers and excessive overtime. Therefore, careful workforce planning is essential to control costs and effort. Optimization is a solution to improve the efficiency of resource use, including labor, time, and cost. The Simplex method, which is used in linear programming, can help in the allocation of resources to achieve optimal results. This study found the optimal labor allocation with 14 workers, 10 blacksmiths, 9 masons, 2 head blacksmiths, 1 head mason, and 6 foremen. The initial labor cost of Rp. 8,180,000,- per day was successfully optimized to Rp. 4,740,000,- per day, resulting in savings of 42.5%. These results show that the Simplex method can improve the efficiency of workforce management without reducing productivity and quality. Research recommends the application of the Simplex method to other jobs and limited resources such as materials, materials and construction equipment.

Downloads

Download data is not yet available.

References

Ardaningsih, N .A., n.d. Optimasi penggunaan tenaga kerja konstruksi menggunakan metode simplex pada proyek Gedung perdriatic Tower Rumah Sakit “JIH” Yogyakarta. TERAS, Vol. XXX (No. X), pp. 1-8
Ervianto, W., 2023. Manajemen proyek konstruksi. Edisi terabru. Yogyakarta: ANDI.
Kerzer, H., 2009. Manajemen proyek: pendekatan system untuk perencanaan, penjadwalan, dan pengendalian. 10th ed. Hoboken: John Wiley & Sons, Inc.
Lendra, L., Robby r. and Faqih, N., 2023. Optimalisasi sumber daya manusia menggunakan aplikasi LiPS pada kegiatan pendampingan proyek drainase Kota Palangka Raya. Jurnal Penelitian dan Pengabdian Kepada Masyarakat UNSIQ, 10(2), pp. 151-161.
Listiyaningsih, D., Sulistiawan, A. and Aulady, M.F.N., 2023. Optimasi upah dan tenaga kerja pada Proyekperumahan Graha Famili Surabaya. Media Ilmiah Teknik Sipil, 11(2), pp.97-103.
Maharany, L. and Fajarwati, 2006.Analisis optimasi percepatan durasi proyek dengan metode Least Cost Analysis. Utilitas, 14(1), pp.113-130.
Meflinda, A. and Mahyarni, 2011. Riset operasi. Pekanbaru: Unri Press.
Nurasiyah, S., Nuradiyansyah, I., Sekaryadi, Y. and Ntawidjana, R, 2024. Optimasi biaya upah tenaga kerja pembesian dengan metode simpleks pada pekerjaan beton bertulang struktur atas. Volume 07, 2, pp.155-164.
Reza Anjasmara, D., 2019. Optimasi Rute dan wak pp.10-18.tu distribusi menggunakan metode Clarke and Wright Saving Heuristic di Coca Cola Official Distributor Waringin. 8(5), pp.1-55.
Sadik, A., rizal, M., Ahadian, E.R. and Tuhuteru, E., 2020. Optimasi tenaga kerja pada pekerjaan pembangunan Gedung FKIP dengan menggunakan metode Simpleks. CLAYPERON: Jurnal Ilmiah Teknik SIpil, 2(1), pp.10-18.
Published
2025-08-28
How to Cite
Rosiana, E., & Lestarini, W. (2025, August 28). OPTIMASI JUMLAH TENAGA KERJA OLEH KONTRAKTOR DENGAN METODE SIMPLEKS PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG SARANA PENUNJANG RSUD PRAMBANAN. Teras, 15(2), 35-41. Retrieved from https://ojs.unsiq.ac.id/index.php/teras/article/view/10149
Section
Articles

Most read articles by the same author(s)