VALUE STREAM MAPPING FOR LEAN CONSTRUCTION WASTE IDENTIFICATION IN PRECAST FAÇADE INSTALLATION: A HIGH-RISE APARTMENT CASE STUDY

Authors

DOI:

https://doi.org/10.32500/jebe.v8i1.11308

Keywords:

Value Stream Mapping; Lean Construction; Construction Waste; Precast Façade; High-Rise Building; Workflow Coordination

Abstract

Precast façade systems are increasingly used in high-rise construction, but their effectiveness depends on the synchronization of material delivery, lifting, work-front readiness, and installation activities. This study aims to identify construction waste and workflow inefficiencies in precast façade installation using a macro-level Value Stream Mapping (VSM) approach. A quantitative descriptive case study was conducted on a high-rise apartment project in Jakarta, Indonesia, involving 33 construction professionals. Data were collected through structured questionnaires, site observations, and project documentation. The results show that 258 of 523 planned façade panels were installed, representing an overall achievement of 49.33%, while the mean achievement across Floors 8–12 was 50.70%. Waiting and inventory were the most dominant wastes, both with a mean score of 4.42, followed by overproduction and overprocessing with scores of 4.36. The macro-level VSM indicates that these wastes are associated with synchronization problems among material delivery, temporary storage, lifting availability, and installation readiness. A Future-State VSM is therefore proposed based on pull-based material delivery, Just-in-Time logistics, lookahead planning, and direct-to-install lifting. Although the proposed configuration has not been empirically validated, it provides a practical framework for reducing non-value-adding activities and improving workflow coordination in precast façade installation.

References

Agrawal, A. K., Zou, Y., Chen, L., Abdelmegid, M. A., & González, V. (2024). Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review. Developments in the Built Environment, 18, 100419. https://doi.org/10.1016/j.dibe.2024.100419

Chen, G., Huang, J., Wang, J., Wei, J., Shou, W., Cao, Z., Pan, W., & Zhou, J. (2023). Optimal procurement strategy for off-site prefabricated components considering construction schedule and cost. Automation in Construction, 147, 104726. https://doi.org/10.1016/j.autcon.2022.104726

Chen, Z., Guo, Z., & Xue, F. (2023). A value stream mapping approach to the identification of lean management opportunities for off-site construction production: A case of reinforced concrete slabs. In CONVR 2023 (pp. 388–397). Firenze University Press. https://doi.org/10.36253/979-12-215-0289-3.38

Cunha, V. C., Formoso, C. T., Amaro, L., & Bulhões, I. R. (2025). Understanding the design process in modular construction projects based on value stream mapping. In Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (pp. 799–809). https://doi.org/10.24928/2025/0163

Dewi, D. H., & Sapitri. (2024). Kajian pemborosan waktu (waste time) dan implementasi value stream mapping pekerjaan sloof dan kolom. Jurnal Saintis, 24(1). https://doi.org/10.25299/saintis.2024.vol24(01).16743

Ding, H., Zhong, R. Y., Li, M., & Huang, G. Q. (2025). Out-of-order synchronization for off-site fit-out in smart prefabrication yard. Automation in Construction, 177, 106355. https://doi.org/10.1016/j.autcon.2025.106355

Emblemsvåg, J. (2024). Lean project planning – Bridging last planner system and earned value management. Heliyon, 10(18), e37810. https://doi.org/10.1016/j.heliyon.2024.e37810

Georges, M. B., Srour, I., & Ibrahim, H. A. (2026). Using Lean Principles to Optimize the Delivery Process of Façade Engineering. 6, 79–95.

Lagos, C. I., Herrera, R. F., Mac Cawley, A. F., & Alarcón, L. F. (2024). Predicting construction schedule performance with last planner system and machine learning. Automation in Construction, 167, 105716. https://doi.org/10.1016/j.autcon.2024.105716

Lauble, S., Steuer, D., Großmann, H., & Zielke, P. (2025). Strategic levers for prefabrication in construction: An economic case study. In Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (pp. 717–728). https://doi.org/10.24928/2025/0115

Liu, G., Wang, H., & Xie, Y. (2024). Just-in-time scheduling problem with due windows and release dates for precast bridge girders. International Transactions in Operational Research. https://doi.org/10.1111/itor.13431

Malika, H., Raut, A., Adamu, M., & Ibrahim, Y. E. (2024). Heliyon Reducing non-value added ( NVA ) activities through lean tools for the precast industry. Heliyon, 10(7), e29148. https://doi.org/10.1016/j.heliyon.2024.e29148

Mitera-Kiełbasa, E., & Zima, K. (2025). Optimising construction efficiency: A comprehensive survey-based approach to waste identification and recommendations with BIM and lean construction. Sustainability, 17(9), 4027. https://doi.org/10.3390/su17094027

Mora, M., Tang, P., & Toledo, M. (2025). Towards enabling sustainability-aware operations in housing manufacturing with AI-driven value stream mapping: A review. In Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (pp. 976–986). https://doi.org/10.24928/2025/0266

Nurlaelah, Alhanif, Basit, Fitriani. (2026). Application of Value Stream Mapping as a Lean Construction Tool in Precast Façade Installation : A Case Study of the “ XYZ ” Apartment Project in Jakarta , Indonesia. 11(02), 9056–9060. https://doi.org/10.47191/etj/v11i02.31

Naser, A. (2025). Integrating advanced work packaging and value stream mapping into last planner system: An operational framework. In Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (pp. 563–574). https://doi.org/10.24928/2025/0159

Nurlaelah. (2022). VALUE STREAM MAPPING FOR WASTE IDENTIFICATION IN THE LOW COST HOUSE CONSTRUCTION PROCESS (CASE STUDY: XYZ HOUSING). International Journal of Civil Engineering and Infrastructure, 2(2), 37–47.

Parameswaran, A., Tam, V. W. Y., Geng, L., & Le, K. N. (2025). Application of lean techniques and tools in the precast concrete manufacturing process for sustainable construction : A critical review. Journal of Cleaner Production, 503(October 2024), 145444. https://doi.org/10.1016/j.jclepro.2025.145444

Power, W., Sinnott, D., & Lynch, P. (2024). Synthesizing Last Planner System, takt, and Scrum theory and practice to enhance construction project delivery. Lean Construction Journal, 2024, 16–28. https://doi.org/10.60164/3xymkr1ws

Wang, H., Yi, W., Zhen, L., & Chan, A. P. C. (2024). Cost-optimized transport planning for prefabricated modules with the implementation of the just-in-time strategy. Journal of Construction Engineering and Management, 150(8). https://doi.org/10.1061/JCEMD4.COENG-14939

Wang, L., Cheng, Y., & Zhang, Y. (2023). Exploring the risk propagation mechanisms of supply chain for prefabricated building projects. Journal of Building Engineering, 74, 106771. https://doi.org/10.1016/j.jobe.2023.106771

Yang, Y., Yu, Y., Yu, C., & Zhong, R. Y. (2024). Data-driven logistics collaboration for prefabricated supply chain with multiple factories. Automation in Construction, 168, 105802. https://doi.org/10.1016/j.autcon.2024.105802

Yin, J., Wang, H., Li, J., Zhang, Z., Cai, S., & Liu, W. (2024). Dispatching rule design for tower crane scheduling in prefabricated construction via genetic programming. Automation in Construction, 165, 105588. https://doi.org/10.1016/j.autcon.2024.105588

Zhang, C., Jiang, J., Xia, C., Fu, Y., Liu, J., & Duan, P. (2024). Dual-objective optimization of prefabricated component logistics based on JIT strategy. Scientific Reports, 14, 31267. https://doi.org/10.1038/s41598-024-82689-w

Zhang, X., & Zhang, X. (2024). Automated component delivery management under uncertainty for prefabricated buildings to minimize cost and harmful emissions. Automation in Construction, 162, 105388. https://doi.org/10.1016/j.autcon.2024.105388

Downloads

Published

31-10-2026

Issue

Section

Articles