“PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PENYELESAIAN PEMBANGUNAN JEMBATAN DENGAN MENGGUNAKAN METODE TCTO (TIME COST TRADE OFF) DAN METODE MANUAL” (2023) Teras, 12(3), pp. 16–24. Available at: https://ojs.unsiq.ac.id/index.php/teras/article/view/4241 (Accessed: 26 November 2025).