1.
ANALISA OPTIMASI BIAYA DAN WAKTU METODE TCTO (TIME COST TRADE OFF) (STUDY KASUS: PRESERVASI JALAN RUAS SP. GUNUNG KEMALA – SANGGI). teras [Internet]. 2021 Jun. 30 [cited 2025 Nov. 26];11(2):16-23. Available from: https://ojs.unsiq.ac.id/index.php/teras/article/view/2537