“EVALUASI KINERJA BIAYA DAN WAKTU PADA PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE NILAI HASIL” (2021) Teras, 11(1), pp. 43–51. Available at: https://ojs.unsiq.ac.id/index.php/teras/article/view/1856 (Accessed: 30 November 2025).