(1)
ANALISA OPTIMASI BIAYA DAN WAKTU METODE TCTO (TIME COST TRADE OFF) (STUDY KASUS: PRESERVASI JALAN RUAS SP. GUNUNG KEMALA – SANGGI). teras 2021, 11 (2), 16-23.