(1)
Optimalisasi Manajemen Nilai Hasil Untuk Pengendalian Waktu Dan Biaya: Studi Kasus Proyek Drainase. j. of economic, management, account. and technology 2025, 8 (1), 94-104. https://doi.org/10.32500/jematech.v8i1.6963.